
St. Albert,
charge where you park.
St. Albert EV Charger Installation
City of St. Albert permit, dedicated 240V circuit and app setup in one fixed price — with wiring plans that respect how the mature crescents were actually built. Emporia Pro and Wallbox Pulsar Plus, in-house Red Seal crew only.
St. Albert’s EV question is really a garage question.
Electrically, St. Albert splits down the middle. North of Villeneuve Road, newer communities were wired for modern loads. The mature crescents that made the city famous — tree-lined streets from the 60s and 70s — often pair a 100A service with a garage that was never meant to feed a car. Both are solvable; they’re just different jobs, and we quote them honestly.
Grandin & Braeside era
Many 60s–70s homes run 100A services, and some park in detached garages. Load management (built into the Emporia Pro, included with the Wallbox) handles the capacity side; where a detached garage needs a new feed, we quote the trench and conduit run upfront — no surprises on install day.
Erin Ridge to Jensen Lakes
Erin Ridge, Oakmont, North Ridge and Jensen Lakes homes typically carry 200A services with attached garages — the textbook install: dedicated 240V circuit, 2–4 hours on site, charging that night.
City permit, handled
The electrical permit runs through the City of St. Albert and is filed under our licensed electrical contractor designation — permit and inspection are in the installed price, and FortisAlberta is your wires company if you ever pair the charger with solar.
Two chargers. Fully installed.
The installed price in St. Albert is the same fixed number we quote everywhere: charger, dedicated 240V circuit, City permit, inspection and app setup, all in. Both come in 40A (9.6 kW) or hardwired 48A (11.5 kW).
Emporia Pro
Fully Installed + GST
Fully Installed + GST
Named one of the Best EV Chargers of 2025 by State of ChargeGet pre-qualified — $0 down →
- Vue 3 whole-home energy monitor included
- PowerSmart load management built in — avoids most panel upgrades
- Charges from excess solar · syncs to off-peak rates
- 25 ft cable · J1772 or NACS connector option
- Watertight NEMA 4 · rated −30°C to +50°C
Wallbox Pulsar Plus
Fully Installed + GST
Fully Installed + GST
Get pre-qualified — $0 down →
- Up to 40 km range/hr (40A) · up to 50 km/hr (48A)
- Plug-in or hardwired (40A) · hardwired for max performance (48A)
- Power Boost load management included
- 25 ft cable · WiFi + app
- Indoor & outdoor (NEMA 4)
- All EVs — J1772 + NACS
- Future-ready for bigger batteries
Wallbox carries a 3-year warranty — see our full coverage →
Compare both chargers in detail on our EV charger page → · What installs cost →
Three steps to charging at home.
Free assessment
We check your panel and parking spot, answer your questions, and give you an exact price. 20 minutes, no obligation.
Install day
Our in-house electricians run the dedicated 240V circuit and mount your charger — most homes are done in 2–4 hours. Permit and inspection handled for you.
Plug in at night
Set your schedule in the app, plug in when you park, and wake up to a full battery every morning.
In-house master electricians · no subcontractors · 535+ installs since 2018 · 5.0 ★ on Google · BBB A+
Ready to charge at home?
Free panel assessment. Exact price before you commit. Installed in as little as 5 business days.
Pre-qualification won't affect your credit score
What a Stellar Upgrades EV charger install actually looks like
Every install completed in-house by Red Seal electricians. Clean EMT conduit, properly secured runs, no subcontractors, no shortcuts.
Installed by our Red Seal Master Electrician and the Stellar Upgrades team — 535+ installs completed since 2018.
Not ready for a form? Text us.
Text your address to (780) 200-5265 and we'll reply with a ballpark quote — usually within the hour.
Text for Quick Quote →Pair your charger with solar panels.
St. Albert’s newer rooflines take solar beautifully, and FortisAlberta net metering banks summer surplus against winter charging. The charger-plus-solar pairing is strongest on Erin Ridge and Jensen Lakes roofs. A typical Alberta solar system produces 10,000–12,000 kWh/year; an EV uses 3,000–4,500 kWh/year.
Asked in St. Albert.
Stop paying for gas.
We check your panel, plan the wiring, confirm exact price. No obligation. 20 minutes.
Free assessment includes on-site evaluation of your electrical panel and electrical systems, roof condition and orientation analysis, and custom system design with no obligation.
- Free assessment — no obligation
- Exact price before you commit
- $0 down financing
- Master electricians — no subcontractors
- All permits & inspections handled
"We installed our solar system almost two years ago, and it's performing exactly the same as day one. The company actually called us after two years just to check if everything was still working properly."