HomeSolarBatteryEV ChargersCalculatorAbout(780) 200-5265Free Assessment →
Canadian Solar EP Cube home battery backup system - the whole-home backup Stellar Upgrades installs in Fort Saskatchewan
EP Cube by Canadian Solar · Whole-Home Backup

Battery Backup for
Fort Saskatchewan homes.

Fort Saskatchewan Battery Backup Installation

When the grid drops, the EP Cube takes over in under 20 milliseconds — whether you're home or four days into a Heartland rotation. No pull-cord, no fuel, nobody has to be there. Installed by our in-house Red Seal Master Electrician, with the City of Fort Saskatchewan permit and inspection included.

Starting at $19,381, all-in — battery, hybrid inverter, install, engineering, permit + inspection in one number
Finance it from $0 down. Flexible terms.
Licensed & insured · In-house master electricians · No subcontractors
550+Installs Since 2018
5.0 ★Google Reviews
<20 msAuto Switchover
10 YrCanadian Solar Warranty
5.0 ★★★★★ on Google
Emma★★★★★

What I appreciated most was their transparent pricing and honest advice. They didn't try to sell me a generic package; instead, they provided a personalized design based on my actual utility bills.

James★★★★★

We installed our solar system almost two years ago, and it's performing exactly the same as day one. The company actually called us after two years just to check if everything was still working properly.

Japdeep★★★★★

Hey if you are going solar I highly recommend this company as it's not here to just take my money and actually help me save money on my bills.

The Short Answer

What battery backup costs in Fort Saskatchewan.

An installed EP Cube battery backup in Fort Saskatchewan costs $19,381 (9.9 kWh) to $24,723 (19.9 kWh) all-in — battery, hybrid inverter, Master Electrician install, engineering, and the City of Fort Saskatchewan permit and inspection. At about 10 kWh per day of critical loads it runs 24 to 48 hours, with automatic switchover in under 20 milliseconds.

Transparent Pricing

Every EP Cube size, priced all-in for the Fort.

Same fixed pricing in Fort Saskatchewan as everywhere we install — no travel fee up Highway 21. Every price below includes the EP Cube battery, its built-in hybrid inverter, installation by our Master Electrician–led crew, engineering, and the City of Fort Saskatchewan electrical permit and inspection. No hidden line items.

EP Cube 1.0 sizeTypical fit in Fort SaskatchewanRuntime @ ~10 kWh/day critical loadsInstalled price (all-in)
9.9 kWhEssentials: fridge, freezer, furnace fan, lights, Wi-Fi~24 hours$19,381
13.3 kWhEssentials plus the sump pump through spring melt~32 hours$21,578
16.6 kWhNewer two-storey homes in Southfort and Westpark~40 hours$22,942
19.9 kWhWhole-home priority loads, rural-fringe acreages, solar pairing~48 hours$24,723

Take $1,000 off any size when the battery is bundled with a new solar install (the bundle discount does not apply to battery-only retrofits). Because the EP Cube grows in modular 3.3 kWh steps, the unit you buy now can be expanded to 19.9 kWh whenever you're ready. Ask about the new EP Cube 2.0 (5–40 kWh modular), offered on consultation pricing. And a blunt note for the Fort: Alberta has zero battery rebates in 2026, so treat any rebate promise as guesswork. Full pricing breakdown →

Financeit handles the $0-down financing, at the standard 7.99% rate (2026). Pre-qualify in minutes →

Runtime Guide

What each size keeps running — and for how long.

Continuous output doesn't change with size: every EP Cube pushes 7.6 kW, which carries the fridge, freezer, furnace fan, lights, sump pump and Wi-Fi all at once. In a river town where the sump pump earns its keep every spring melt, capacity decides how long they keep running.

What's runningDraw9.9 kWh13.3 kWh16.6 kWh19.9 kWh
Fridge + freezer only150W~66 hrs~88 hrs~110 hrs~132 hrs
Furnace fan500W~20 hrs~26 hrs~33 hrs~40 hrs
Critical loads bundle*~10 kWh/day~24 hrs~32 hrs~40 hrs~48 hrs

*The critical-loads bundle assumes the fridge, freezer, furnace fan, lights, sump pump, Wi-Fi and phone charging are all drawing at once. Actual runtime varies with usage. Add rooftop solar and the clock stops mattering — the battery refills every day, so outage coverage effectively never runs out.

Built For This Community

Why Fort Saskatchewan homes are adding battery backup.

Alberta's grid has already rehearsed the argument. The evening of January 13, 2024, every phone in the Fort buzzed at 6:44 p.m. with a province-wide emergency alert as the AESO declared a grid alert and asked Albertans to cut usage immediately. Then April 5, 2024 moved from warning to reality: rotating outages that shed roughly 244 MW of firm load between 8:53 and 9:16 a.m. Day to day, FortisAlberta customers — that's the Fort's wires utility — average under 1.3 hours of outage a year. Short and rare, but always unannounced. And in a town where a big share of households run 4-on-4-off Heartland rotations, the outage that matters is the one that hits while nobody's home.

Nobody home to start it

A 4-on-4-off rotation at Dow, Sherritt or the refineries means the house sits with an empty driveway for days at a stretch. A portable generator waits for someone to wheel it out, fuel it and pull the cord. The EP Cube switches over in under 20 milliseconds on its own — sump pump running, freezer cold, furnace protected at −30°C.

📜

Fort permit, Fortis wires

Battery permits here go through the City of Fort Saskatchewan, and your wires belong to FortisAlberta — not EPCOR, not ATCO. Rural-fringe acreages on longer Fortis feeders see fewer but longer outages, which is exactly the profile a battery covers best. Our in-house Red Seal Master Electrician pulls the permit; the City inspection is coordinated for you.

Straight math, no sales pitch

There are no residential time-of-use rates in Alberta, so there's no rate arbitrage to promise — what you're buying is resilience plus solar self-consumption. A battery on its own won't shrink an Alberta bill, and we'd rather tell you that up front. Its real job: the furnace fan, sump pump and fridge stay alive when the grid can't manage it.

★★★★★  Real Stellar install · Sherwood Park, AB — 20 minutes down Highway 21

“Our solar was installed four years ago by a different company. When we asked them about adding battery backup, they said they couldn’t figure out the integration. Stellar got it done. The EP Cube ties into our existing solar and our Generac standby, and the system manages itself — solar by day, battery at night, generator as final backup. We don’t worry about outages anymore.”

Merlin · 19.9 kWh EP Cube + existing rooftop solar · Verified Stellar Upgrades battery customer
Red Seal electrician wiring an EP Cube home battery backup at an Edmonton-region Stellar Upgrades install serving Fort Saskatchewan
Canadian Solar EP Cube home battery wall-mounted in an attached garage by Stellar Upgrades - the standard battery backup install for Fort Saskatchewan homes

Every job is run by the Stellar Upgrades team under our Red Seal Master Electrician — the same way we've completed 550+ installs since 2018.

Wires: FortisAlbertaPermit: City of Fort SaskatchewanJan 13, 2024: province-wide grid alertApr 5, 2024: rotating outagesNo meter swap for battery-only installs
Simple From Start to Finish

Four steps. Typically 4–6 weeks.

1

Free assessment

We inspect your panel and garage wall, walk through which circuits you want backed up — sump pump included — recommend the right EP Cube size, and confirm your exact all-in price. No obligation.

2

Engineering & permit

Our team prepares the drawings and our in-house Red Seal Master Electrician pulls the electrical permit with the City of Fort Saskatchewan — the Fort's actual permit authority.

3

One-day install

Mounting, wiring, the panel tie-in and the automatic-switchover setup all happen in a single day on site. Battery-only work also leaves the FortisAlberta meter alone — no swap required.

4

Inspection & commissioning

City inspection, commissioning, and EP Cube app setup on your phone — so you can check the house from the plant. From signed agreement to a commissioned battery typically takes 4–6 weeks.

The Name on the Permit

Your permit carries a Red Seal Master Electrician's name.

Because a battery ties into your main panel and reconfigures how the house takes power, the law requires its electrical permit to be pulled by a licensed electrical contractor. Stellar's in-house Red Seal Master Electrician is named on every permit we pull, in Fort Saskatchewan and everywhere else we work. Subcontracting isn't how we operate — the same crew that prices your battery is the one that shows up to install it. Batteries are wall-mounted in the attached garage in most Fort homes — the standard location under Alberta STANDATA Variance 21-ECV-064-900-ESS, with capacity capped at 20 kWh per unit and 40 kWh per dwelling by CEC Rule 64-918.

Payroll, not subcontracts

Every certified electrician on your job works under our Master Electrician of record. No subcontractors on any residential install, ever.

🛡

$5M insured · BBB A+

We carry $5M in general liability insurance, hold BBB A+ accreditation and current WCB clearance, and have had the same Master Electrician on every permit since opening in 2018.

📋

Built to the letter of the code

Attached-garage mounting follows Alberta STANDATA Variance 21-ECV-064-900-ESS, capacity follows CEC Rule 64-918, the hardware is NEMA 4X-rated, and Canadian Solar backs it with a 10-year / 6,000-cycle warranty.

Fort Saskatchewan FAQ

Asked in the Fort.

Installed EP Cube pricing in Fort Saskatchewan is $19,381 (9.9 kWh), $21,578 (13.3 kWh), $22,942 (16.6 kWh) and $24,723 (19.9 kWh) — all-in with the battery, built-in hybrid inverter, Master Electrician installation, engineering, and the City of Fort Saskatchewan permit and inspection. Take $1,000 off when you bundle with a new solar install. With no battery rebates on offer anywhere in Alberta in 2026, the number you see is the number you pay.

Plan around 10 kWh a day to cover a Fort Saskatchewan home's critical loads: fridge, freezer, furnace fan, lights, sump pump and Wi-Fi. At that draw, the 9.9 kWh delivers ~24 hours, the 13.3 kWh ~32, the 16.6 kWh ~40 and the 19.9 kWh ~48. Cut back to nothing but the fridge and freezer and even the smallest size holds out for ~66 hours. Paired with solar, the battery recharges every day.

Stellar does, in-house. A home battery install legally requires an electrical permit pulled by a licensed electrical contractor, and the City of Fort Saskatchewan is the permit authority here. Every permit we pull carries our in-house Red Seal Master Electrician's name, we coordinate the City inspection on your behalf, and both are already built into the installed price. Your wires and meter stay with FortisAlberta throughout.

The battery, and rotation schedules are exactly why. A portable generator needs someone home to wheel it out, fuel it and start it — useless four days into a Heartland rotation. The EP Cube switches over in under 20 milliseconds automatically, with no fuel, no exhaust and no maintenance, whether you're in the kitchen or on nights at the plant. FortisAlberta customers average under 1.3 hours of outage a year, which favours instant hands-off coverage.

Nothing you have to deal with from the plant. The EP Cube detects the outage and takes over your backed-up circuits in under 20 milliseconds — the sump pump keeps running through a spring-melt storm, the freezer stays cold, the furnace stays on in February. The EP Cube app shows grid status and battery level on your phone, so you know the house is fine before your four days are up.

Yes. The EP Cube's built-in hybrid inverter supports AC and DC coupling, so it integrates with virtually any existing rooftop system, whichever installer put it up. Battery-only retrofits don't need a FortisAlberta meter swap either. One caveat: the $1,000 bundle discount is reserved for batteries paired with a new Stellar solar install — battery-only retrofits don't qualify.

Typically 4–6 weeks from signed agreement to commissioning: site assessment, engineering drawings, the City of Fort Saskatchewan electrical permit, then the install itself — one day on site to mount, wire and configure switchover — followed by City inspection and commissioning. And because a battery-only install never touches your FortisAlberta meter, you skip the meter-swap wait that comes with a solar project.

Often more than in-town homes. Acreages on the Fort's rural fringe sit on longer FortisAlberta feeders, where storms and vehicle strikes take longer to isolate and repair — the same under-1.3-hour average arrives as fewer, longer outages. A 16.6 or 19.9 kWh EP Cube carries a well pump, freezers and the furnace comfortably, and CEC Rule 64-918 allows up to two units per dwelling — about 39.8 kWh of practical storage.

Ready for outage-proof power in the Fort?

Free assessment, exact all-in price before you commit, and a commissioned battery typically 4–6 weeks after you sign — working for you even when the driveway's empty.

Get Free Assessment → Call (780) 200-5265

$0-down financing available · Pre-qualification won't affect your credit score

Not ready for a form? Text us.

Send your address by text to (780) 200-5265 and a ballpark battery quote comes back — usually inside the hour.

Text for Quick Quote →
Free Assessment

Four days away shouldn't mean a dead sump pump.

One visit: your panel gets checked, the switchover wiring gets planned, and your exact all-in price gets confirmed. No obligation. 20 minutes.

The free assessment covers an on-site look at your electrical panel, a plan for which circuits stay backed up, EP Cube sizing against your real loads, and a firm installed price — no obligation attached.

  • Free assessment — no obligation
  • Exact all-in price before you commit
  • $0 down financing
  • Master electricians — no subcontractors
  • City of Fort Saskatchewan permit & inspection handled
★★★★★

"The EP Cube ties into our existing solar and our Generac standby, and the system manages itself — solar by day, battery at night, generator as final backup. We don’t worry about outages anymore."

Merlin · Sherwood Park · Verified battery customer

Get your free battery quote

By submitting, you consent to Stellar Upgrades contacting you by phone, text or email about your inquiry. Unsubscribe anytime. Privacy Policy
No spam. We respond within 24 hours.

Thank you!

We'll contact you within 24 hours.

Need us sooner? (780) 200-5265

Get My Free Assessment